Test-5.0

Test-5.0
None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#1 Manual run by Martin Winter

#2 Manual run by Martin Winter

1 build

13 minutes

  • Average time to fix a failure: 13 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 13 minutes, from failure starting in build #1.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #1.